About the Range
A great
location has been acquired and now development is needed to make
the Range the best Royal Ranger campground possible. Your
investment will make you a partner with New Mexico Royal Rangers in
reaching a common goal - developing Christian men and boys.
A great deal of progress has been made
in the development of the Range in preparation for the New Mexico
District Pow-Wow. We would like to thank all those individuals who
have spent time working on the property. We were fortunate to get
the road base in place by the 2003 Territorial Rendezvous. We would
like to thank PG Enterprises for completing the roadwork on a tight
schedule. More than a mile of roadwork is now complete.
We are currently working on a number of
projects: clearing trees and brush left behind from the roadwork,
continued development of the rifle range, fencing for the western
boundary, road work to control erosion, and continued development of
the amphitheater. In the next couple of months a site development
plan will be drafted. If you have comments or suggestions, please
contact District Commander; Bart Garrison, or Site Manager; Ted
Schmidt Sr.
Current Projects and Development:
1. Walking Bridge - the Draw
The foundation (see pictures on right)
for a walking bridge to be placed across the large draw has been
acquired. The railing, supports, and trusses are currently being
constructed. Thanks to Jim and Howard Chappell for the many hours of
metal work required to construct the bridge.
2.
Development
of the Amphitheater - Completed 8/1/04
Clearing of the amphitheater site is
done. The size of the amphitheater has doubled in size from it's
size at the 2003 Pow-wow. All trees and stumps have been removed. A
culvert needs to be installed for drainage. Terracing will begin in
late June. General lighting is also needed.
3. Development of the Shooting
Range
The current shooting range has been
effectively utilized in many Royal Ranger events over the past two
years. Plans are in place to increase the width and depth of the
shooting range. Also, the berm size needs to be doubled on the back
end of the range and increased on the sides. Bulldozer work needs to
be done.
Upcoming Projects:
1. Erosion control
2. Fencing of the western boundary
3. Electricity run to the entire site
Completed Projects:
1. Roadwork (1 mile +)
2. Culverts installed for three draws
3. Flag poles installed
4. Large draw stairwell
5. Fully functional trail house - Thanks
6. Amphitheater
Items Needed:
1. Monetary Contributions - made payable
to the Range Heritage Foundation
2. Man hours
3. Bulldozer work
For more information on
how you can contribute or help, please call the Site Manager - Ted
Schmidt Sr - 831-3627